For instance an 8 thick hardwood mat usually weighs around 155 lbs per foot.
Weight of timber crane mats.
4 x 16 light crane mat.
5 x 20 crane mat quantity.
6 approximately 27 lbs per sq ft.
If you used fir mats which weigh 1 975 lbs a mat your total cost would be approximately 42 000.
You can cut your shipping costs by 60.
The 1 producer supplier of timber mats digging mats and dragline mats in truckload higher quantities built out of 8 thick timbers timber mats are used to build cost effective roadways and work areas in unstable environments for all different sizes of equipment.
These are savings that only compound themselves over the life cycle of the crosslam access mat.
Truckload superior strength 25000 lbs.
Usable surface area approximate weight.
Industry standard 5 x 20 mat complete with 4 bolts 1 1 4 diameter countersunk both sides daps notches on opposing ends for access to pick up points.
However if you used crosslam mats which only weigh 1 150 lbs a mat then your costs would be 24 000.
Crane mat weights per sq.
So a 16 mat would weigh 2 500 lbs and an 18 mat would weigh 2 800 lbs.
Bridgewell offers a full range of timber mats for crane support pipeline work temporary road access excavator and dragline projects.
12 approximately 54 lbs per sq ft.
When you look at crane mats that are normally 12 thick the weight per foot goes up to around 240 lbs per foot.
Solid bolted timber access mat 8 x 14 x 5 25 standard 112 sq.
1 380 00 only ships from vancouver bc.
Compare a traditional standard sized crane mat at 3640 lbs to the much stronger and lighter 8 thick clt crane mat at 1900 lbs or a 12 mat at 2533 lbs and you can see how the weight difference adds up when it comes time to ship to the site.
8 approximately 36 lbs per sq ft.
The answer is that the weight of crane mats can vary substantially based on the size and type of mat.
150mm bog mats ideal for middle to heavyweight cranes plant and large trucks usually weighing greater than 35 tonnes.
This mat is often used as a sub soil for pontoons or concrete floors and in civil projects up to 60 tonnes.
Per mat 30 mats per avg.