Apply thin layer mortar recommended.
Wedi subliner dry ok for heat mat.
Wedi subliner dry is a membrane sealing system for humid areas with moderate load i e.
Wedi subliner dry features.
Step 2 cut grooves using the router.
Step 1 draw ducts grooves onto the wedi building board for installation of the heating system.
Start to finish time lapse schluter bathroom kerdi line linear drain ditra heat large format tile.
The fleece mats must overlap 2 at all joints.
Wedi 320 on the prepared underground with a 4 or 6 mm grooved trowel.
Thin layer crack bridging sealing web manufactured from highly tear resistant polyethylene film which offers optimum connection to tile laying materials thanks to its dual sided special fleece lamination.
Cutting depth should be at least 3 mm deeper.
Water vapour retardant.
Strong adhesion of wedi laying materials.
Tile spacers wedges.
Radiant floor heating wire.
Moisture exposure class a0 as per the zdb data sheet.
Insert wedi subliner dry with the printed side facing upwards and press on with a rubber roller or wooden float.
This includes but is not limited to.
Apply wedi subliner dry and flex with the printed side upwards joint to joint and press it on with a rubber roller or wooden board.
Wedi leak proof mold proof tile backerboards and shower systems.
Lay out wedi subliner dry and flex and cut to size with a cutter or scissors.
Large format tile tools.
Domestic bathrooms hotel bathrooms.
Tile hole saws core router bits.
Can be used on hot water underfloor heating.
Cutting width should be the same as the pipe width.
Sal diblasi 2 897 722 views.
Radiant floor heating mats.